Duphil Pipeline Division
“Lonestar is assisting Duphil with a project in Mont Belvieu, TX that requires an extensive amount of hydro-excavation. The main phase of the project is 1 mile of multiple pipelines in the same ditch.
With the level of uncertainty of what is underground, we are hydro-excavating outside of ditch line to outside of ditch line for the entire mile of the ROW. Along with outside of the ditch lines we are also hydro-excavating across the ditch every 100′, basically a latter ditch for the entire mile. By doing this we are eliminating the element of surprise and exposing any and all lines in our ditch line.
Lonestar is doing a very good job with assisting Duphil on this project. The equipment is top notch to the competitors and with the progress Lonestar is making, it will ensure Duphil to stay on track and on schedule, thanks again for all Lonestar’s team effort with this project, much appreciated.”
Cenovus Energy Co.
“Lonestar put in an 89 lineal foot trench at 3′ wide X 5′ deep through some very heavily pounded frost (in high traffic areas). Nice neat work, clean concise trenching, work performed safely. Thanks once again for a job well done and for the great service!”
Jones Blythe Construction Co.
“The hydrovac trucks and personnel that Lonestar sent to my job site have been excellent. The workmanship is great and fast. I have worked with other companies doing this and Lonestar is the best I have been around.
In the future if I need this type of work done in your area our company will use Lonestar. I do appreciate the fact that all the employees follow our safety standards and rules without any trouble or hassle. The crews that have been here should be commended on their work ethics and skills. Lonestar’s equipment is very well kept and functions properly. Again thank you for your cooperation in working with us”